Projects

05/21/16

Home
Adventures
Photo Gallery
Sea Dragon Specs
Projects
Manuals
Recent Updates
Links

 

This page is dedicated to projects large and small.


bulletInstalling Autopilot
bulletInstalling a Shaftlok Drive Shaft Brake
bulletMoving the Traveler Forward
bulletReplacing the Winches
bulletAdding Fans Below
bulletAdding Screens to Hatches & Companion Way
bulletAdding a Third Battery
bulletReplace Hot Water Heater
bulletRebedding the Hatches
bulletReplacing Instruments
bulletAdding a Tricolor
bulletRigging Upgrades
bulletAdding a Winch to the Boom for the Reefing System
bulletReplacing Anchor Rode & Deck Pipe
bulletReplacing Rudder Gudgeon (produced by Richard Mogford)
bulletAdding Grates to Head/Shower & Cockpit Table Modifications
bulletWinterizing Sea Dragon
bulletFailed Winterization of our Raritan PHEII Marine Head
bulletBleeding the Westerbeke W40
bulletReplacing the Raw Water Circuit Zinc
bulletDetail Drawing of Sea Dragon's Ice Box
bulletReplacing the Deck Hand Rails
bulletReplacing the Damper Plate in Westerbeke W40
bulletRebedding the Pulpit
bulletBattery Configuration aboard s/v Water Spirit (Produced by Richard Mogford)
bulletReplacing the Original Ports with New Found Metals Stainless Steel Ports
bulletWesterbeke Cooling system Modifications
bulletInstalling an S100 Wireless Remote for the Autopilot
bulletBuilding & installing a Lazy Jack system
bulletElectric Upgrades - Battery & Circuits

        Maintenance Log

 

Home | Adventures | Photo Gallery | Sea Dragon Specs | Projects | Manuals | Recent Updates | Links

This page was last updated 05/21/16

Copyright 2006 Garner Bennett. All Rights Reserved